Pinewood has finished the gas manifold and it's quite a site. The manifold has shut offs for every gas appliance in the house. Meanwhile, Tony has moved down to the main floor electrical rough-in.
Thom started on the back stone today - I love it! He does such great work. I also received the water meter today, so we should have water in a week's time.
Pinewood was back today to install the gas piping into the house. I also had to rent a huge hammer drill to get a hole cut through between the furnace room and the storage under the garage to allow for a heat run.