Now... we wait. Well, I'm not waiting, with lots of planning and preparation to do, but we do have to wait to demolish. Our building permit should be done by at least next Friday, so I have fencing and portable toilet arriving next week. If all goes well, demolition will begin on Monday, November 7th.
Wednesday, October 26, 2011
Monday, October 24, 2011
Plan in Profile
While meeting with the City approved contractor for the sanitary and water upgrade, we found out that 72 Eagle was in front of a manhole the represented the "end of the line" for the sewer.. which means that it is one of the higher points of system. I whipped over to City Hall to get the "Plan in Profile" for the sanitary system and water supply, and sure enough, we've had to make adjustments to the depth of the foundation in order to have an acceptable angle for the floor drains to reach the sewer system.