Tuesday, April 24, 2012

Tile, drywall and exterior

Victor continues the tile prep work - dry pack for the shower basins ate done, scratch coat on the heated floors are done and after tony installed the floor coils today, victor applied the scratch coat and mesh on top so the coils are protected.

Mean while, taping continues throughout the house and Juvenal got a bit of work on the exterior done, despite the rain.

No comments:

Post a Comment